How to get a Sewer Connection

Metal Pipe Network
  • Check whether it is an area where sewer piped network is available.

  • Check for the closest NWSDB Water Reclamation Office & collect the application form for a new sewer connection. (or download blank application form following section)

  • Fill the application form and submit at the NWSDB office with copies of supporting documents.

  • An Engineering Assistant or the Officer-in-Charge will make an inspection to your premises to take measurements and prepare a cost estimate. A payment voucher and road damage request letter to the relevant authority will be given to the consumer. This will take a maximum of 7 days depending on the number of outstanding applications.

  • Where the road pavement has to be cut open to give the new sewer connection, a road reinstatement charge has to be paid to the relevant Local/ Road Authority. The relevant Authority and road damage area will be intimated to the applicant along with the letter.

  • At this stage, the applicant can make the payment. The payment to the Local/ Road authority has to be made to them directly by the applicant. The applicant shows evidence of making both payments (where applicable) to the NWSDB office.

  • The applicant signs an agreement with the NWSDB. (this agreement format can be viewed in the following section)

  • The sewer connection will be provided within maximum of 02 weeks after the payment is made.

Download Agreement
Download Application
  • Annual  Reports

  • Regulatory Documents

  • Planning Documents

  • Other Publications

  • List of plants

  • Plan a site visit

  • Video clips

  • Our Plants

  • Down the Memory lane

  • Awareness Programs

  • Books Related to Sanitation

  • How can I get a sewer connection

  • Payment Instructions

  • New Connection Request

  • Download Application

bottom of page