Check whether it is an area where sewer piped network is available.
-
Check for the closest NWSDB Water Reclamation Office & collect the application form for a new sewer connection. (or download blank application form following section)
-
Fill the application form and submit at the NWSDB office with copies of supporting documents.
-
An Engineering Assistant or the Officer-in-Charge will make an inspection to your premises to take measurements and prepare a cost estimate. A payment voucher and road damage request letter to the relevant authority will be given to the consumer. This will take a maximum of 7 days depending on the number of outstanding applications.
-
Where the road pavement has to be cut open to give the new sewer connection, a road reinstatement charge has to be paid to the relevant Local/ Road Authority. The relevant Authority and road damage area will be intimated to the applicant along with the letter.
-
At this stage, the applicant can make the payment. The payment to the Local/ Road authority has to be made to them directly by the applicant. The applicant shows evidence of making both payments (where applicable) to the NWSDB office.
-
The applicant signs an agreement with the NWSDB. (this agreement format can be viewed in the following section)
-
The sewer connection will be provided within maximum of 02 weeks after the payment is made.
Download Agreement
Download Application
-
Annual Reports
-
Regulatory Documents
-
Planning Documents
-
Other Publications
-
List of plants
-
Plan a site visit
-
Video clips
-
Our Plants
-
Down the Memory lane
-
Awareness Programs
-
Books Related to Sanitation
-
How can I get a sewer connection
-
Payment Instructions
-
New Connection Request
-
Download Application